Phone: 800-972-5587 Request a Quote

The Particulars of Treating Materials with Fire Retardants

Successful flameproofing depends on identifying the material, selecting a compatible approved product, applying it correctly, and confirming the result.

Successful flameproofing depends on identifying the material, selecting a compatible approved product, applying it correctly, and confirming the result.

Material Evaluation Comes First

Curtains, scenery, hangings, decorative greenery, fabrics, and some wood products may require coating or soaking unless they are documented as inherently resistant. Construction, finish, colorfastness, access, and previous treatments can influence the method. A small compatibility test may be appropriate before full application.

The work is not complete when the surface becomes wet. The treatment must reach the required coverage, dry properly, and meet applicable testing and documentation requirements. Washing, dry cleaning, excessive handling, or later alterations may require the item to be evaluated and treated again.

Plan for Compliance and Safety

Requirements depend on the venue, material, installation, and current rules. Have a qualified professional review the project, retain all product and treatment records, and coordinate flameproofing with the rest of the property's fire-safety plan.

From Material Review to Final Verification

Professional flameproofing begins with identifying the material and deciding whether it is inherently resistant, previously treated, or suitable for a new application. Fiber content, coatings, paint, backing, colorfastness, installation, and access can affect product selection. A compatibility test can help identify staining, texture changes, or poor absorption before the full item is treated.

Application must follow the approved product instructions, including coverage and drying. Testing too soon can produce misleading results because moisture changes how a sample behaves. When a field flame test is required, it should be conducted by the qualified holder using a representative sample and proper fire-safety precautions.

A Reliable Treatment Sequence

  1. Inventory and identify every covered material.
  2. Select an approved and compatible fire retardant.
  3. Protect the finished venue and apply the specified coverage.
  4. Allow the material to dry under suitable conditions.
  5. Complete required testing and retreat any material that does not pass.
  6. Issue accurate records and explain cleaning and retreatment limits.

Customers should never be promised permanent or unlimited protection. Time, washing, dry cleaning, handling, weather, and later alterations can all require another evaluation.

Original Topic

Read the original Queens Flameproofing article

FDNY-Approved Flameproofing for Your Venue